Nepal Development Bank Ltd.(NDBL) invites proposals from
interested parties to purchase an instant noodles manufacturing
plant with an installed annual capacity of 2,700 ton based
on single shift operation. The factory is located at Itahari-3,
Sirijunga Tole, Sunsari, Nepal with total land area of 1Bigha
3 Katha i.e. (23kattha). All the equipment and plants are
imported from India, Japan, China and Singapore and based
on the state of the art technology. Plants and machineries
are in good working condition and can be operated at any
time. The buildings have been constructed to suit the requirements
generally stipulated processing units by multinational companies.
The factory site is about 20 km from Biratnagar Town. The
Indian check post of Jogbani is about 3 km from Biratnagar
and Siliguri Town is about 80km. A new approach road is
under construction which passes near the south end of the
factory wall and connects the East West Highway which is
about 0.5km from the factory site.